Project temporary kitchen Deurne Belgium

At a hospital in Deurne (Belgium) they needed to renovate their kitchen and consequently they had to look for a temporary solution for 6 months in order to maintain the meal distribution to the patients.

NxtGen modular buildings erected a modular building of about 525m2 according to their new NxtGen construction system in which they installed the production kitchen, cooling and freezer spaces, dry storage and spaces for the staff.  This system allows for a high grade of flexibility in terms of lay-out.

The result?  A very satisfied customer and a proud project team of NxtGen modular buidings!